Home/Cases/Sudan 700t/d Rock Gold Mineral Processing Plant

Sudan 700t/d Rock Gold Mineral Processing Plant

The Sudan 700t/d gold mineral processing plant was an EPC+M+O project. The ore of this project contained 2.97g/t of gold, most of which were earthy minerals with particle size below 2mm. A small part of the ore was blocky minerals, and the maximum particle size was 70mm.

Sudan 700t/d Rock Gold Mineral Processing Plant

Xinhai Solution

One-stage open-circuit crushing.

CIP-desorption electrolysis-smelting.

Press filtering and tailings dry stacking.

Sudan 700t/d Rock Gold Mineral Processing Plant

Sudan 700t/d Rock Gold Mineral Processing Plant

Sudan 700t/d Rock Gold Mineral Processing Plant


Project Result

The project produced qualified products which brought substantial profits, and created new job opportunities. Effective measures were taken for the disposal of waste water and gas, leaching slag, smelting gas, tailings, dust and garbage and the control over noise. As a result, economic, environmental and social benefits were achieved.

Related Products